Our Build Process

From Vision
to Reality

Six precision-engineered phases take your project from the first conversation to handover, with a schedule built around its design, permits, site, and scope.

Qoterie build planning and construction process
Weekly

Project Updates

0

Clear Phases

0

Surprises

1/16"

FrameCAD Tolerance

01

Consultation & Vision

Discover Your Vision

It starts with a conversation. We discuss your vision, your land, your budget, and your timeline. You walk away with a clear scope document and a realistic roadmap — before committing to anything.

1-2 weeks
02

Design & Engineering

See It Before It Is Built

Qoterie coordinates photorealistic 3D renders, engineering, and permit-ready architectural plans with its design network. FrameCAD software generates exact steel frame specifications — every stud, joist, and truss engineered to 1/16-inch tolerance.

2-3 weeks
03

Permitting

We Handle Everything

We manage all Maui County permit applications so you never have to. Our team navigates the updated post-fire building codes, environmental reviews, and inspections — keeping your project moving without bureaucratic delays.

2-4 weeks
04

Steel Frame Fabrication

Factory-Perfect Components

FrameCAD precision manufacturing produces your steel components in controlled factory conditions. Computer-controlled roll-forming machines deliver parts to 1/16-inch tolerance. No weather delays. No material waste. No on-site cutting errors.

1-2 weeks
05

Construction

Project-Specific Schedule, Weekly Updates

Certified steel frame specialists assemble your home on site. Pre-fabricated components fit together with precision, completing framing 60% faster than traditional wood construction. You receive weekly progress updates with photos and video.

Schedule set after design & permitting
06

Handover

Your Keys, Your Home

Custom finishes, systems integration, and final inspections complete. We document your finished home with a Matterport 3D digital twin — a full virtual walkthrough you can share — and hand you the keys to a structure built to last 100+ years.

1-2 weeks

Why It Works

Precision at Every Phase

Traditional construction is full of guesswork, weather delays, and change orders. Our FrameCAD-driven process eliminates all three.

0%
Faster Framing

Pre-fabricated steel components assemble 60% faster than traditional wood stick-framing on site.

1/16"
Tolerance

FrameCAD engineering produces components to 1/16-inch precision. No shimming, no field adjustments, no waste.

0+
Year Lifespan

Galvanized steel framing lasts over a century — no termite damage, no rot, no structural degradation.